1 Reply Latest reply: Aug 18, 2011 3:58 PM by Leviton Technical Representative RSS

Why does a node have to be powered off and on to pass a network rediscovery?

Newbie

I am doing a Network rediscovery on a 126 node network trying to improve the network performance. I have done the rediscovery several times at different levels from -3db to – 7 db. One node will not pass unless the breaker for the node is powered off and on several times. Any suggestions?